P-09 · interimLINE
A
Non-cyanide alkaline zinc (blue, yellow & black passivation) · Alkaline zinc-nickel (blue & black)

Three automatic plating lines, bath chemistry checked every four hours, coating thickness measured on every lot, and every bar traced in our own ERP — trusted by suppliers to Toyota, Isuzu, Nissan and Ford.
Parts we plate go into vehicles from
01About Chayatat
Chayatat Products (CTP) has plated and polished metal parts for automotive suppliers since 2013. We invest in automatic lines, an in-house chemical lab, test equipment and our own ERP so that every lot comes out the same — and can always be traced.
P-49 · interim70
people on our team
02What we do
Non-cyanide alkaline baths and trivalent (Cr³⁺) passivation throughout — no hexavalent chromium.
03Process control
Plating and passivation tanks are dosed automatically, while bath concentration, tank times, plating current and oven temperature are recorded in our ERP so every lot can be traced.
04Production lines
Automatic hoists and per-part programs give every bar the same tank times and current, every time. Each box shows the line’s maximum part envelope (mm) next to a 1.7 m person.
P-09 · interimLINE
Non-cyanide alkaline zinc (blue, yellow & black passivation) · Alkaline zinc-nickel (blue & black)
LINE
Non-cyanide alkaline zinc (blue passivation) · Alkaline zinc-nickel (yellow)
LINE
Data pending
05Process
Straight from our zinc-nickel QC process chart, with quality checkpoints at every critical stage.
Inspect incoming parts, rack them and set the plating program for the part type
Steps 1–4
Degrease, pickle, electro-clean and activate — truly clean before plating
Steps 5–18
Zinc-nickel plating with current controlled and logged by the PLC for every bar
Steps 19–21
Trivalent passivation, sealer, air blow and oven drying
Steps 22–28
QC check, packing, QA check and functional test before storage
Steps 29–32
Organised storage and delivery to plan
Steps 33–34
06Test lab & quality control
Every lot gets a five-point thickness check, every bath is analysed every four hours, and we run our own full set of test equipment.
P-22 · interimXRF thickness analyser
P-24 · interimSalt spray testing
P-20 · interimBath analysis every 4 h
P-26 · interimHeat quench tester
P-37 · interim07Production control
We built an ERP specifically for plating. It connects every department and takes data straight from the line PLCs, so customers get instant status answers — and when a lot needs tracing, we have real data for every step.
08Certification
Both a general quality management system and the automotive industry’s own standard.
Certified
Quality management system
First certified on 11 April 2016 and maintained ever since.
Certified
Automotive quality management system
The standard carmakers and Tier 1 suppliers use worldwide, built around defect prevention and traceability.
09News & insights
Start your plating project